Blue Planet Chatterley Valley Regeneration Project, Stoke-on-Trent, United Kingdom

Email-Icon
 
Print-Icon
 
Link-to-us
 
Related Projects
key facts
Key Data
Size
35,500m²
Start Date
May 2008
Completion Date
December 2008
Client
Gazeley UK Limited

This landmark regeneration project sits on 23ha former colliery site in North Staffordshire, close to Stoke-on-Trent in the UK. It was earmarked for development by Newcastle Borough Council and Advantage West Midlands, with sustainable economic regeneration playing a key part in the project.

The scheme aimed not just to concentrate on sustainable technologies but also to focus other key sustainability criteria including the social, economic and community requirements. As such, one of the main design objectives was to ensure that the scheme added something to the local environment and its community. Blue Planet Chatterley Valley is the first ever BREEAM 'outstanding' rated building, with exemplary scoring in four areas of assessment and achieving an exceptional standard of sustainability as a carbon-positive development.

The 35,500m² Blue Planet is projected to save up to £300,000 a year in reduced running costs as a result of the environmental features incorporated into its design. It proves once again that environmental buildings not only benefit the environment but achieve high returns on investment.

Blue Planet's renewable energy sources

100% of Blue Planet's energy and heat is supplied by renewable sources – bio-mass boilers, photovoltaic panels mounted within ETFE roof lights and electro-kinetic road plates provide enough excess energy to heat and power 3,100 local homes. Besides having water-efficient fittings, a rainwater-harvesting system is installed for storage and reuse within the building, saving 60% of the water requirement. A site-wide water strategy allows water attenuation to be controlled on site, catering for a one-in-100-year flood risk while providing additional ecological features.

Most materials used on Blue Planet are A+ or A rated in the BRE Green Guide to Specification and all timber is FSC approved. This includes composite wall and roof panels and ETFE rooflights. Over 40% of materials are sourced from local suppliers within a 35-mile radius, while most internal materials are from organic sources and are recycled and/or recyclable. The development targets zero waste to landfill. The waste tonnage generated is minimal and any waste that is generated is recycled, with most suppliers managing waste and returning it to their manufacturing plants to be recycled.

A number of ecological enhancements have been incorporated into the scheme to benefit the site. These include increases in the native species and the incorporation of new 'green' public spaces adjacent to the building. The development also reconnects two public areas by creating an 'environmental linear park', which includes additional landscape and play areas.



Expand Image Expand Image
The Blue Planet landmark regeneration project sits on 23ha former colliery site in North Staffordshire.



Expand Image Expand Image
100% of Blue Planet's energy and heat is supplied by renewable sources.



Expand Image Expand Image
The 35,500m² Blue Planet is projected to save up to £300,000 a year in reduced running costs as a result of the environmental features incorporated into its design.



Post to:
Delicious  
Digg  
reddit  
Facebook  
StumbleUpon  


Newsletter Sign-Up
For all the latest news in the design and construction industry, sign up here

Home
New On This Site
Products & Services
Company A-Z
Projects
Features
Inside Architecture
Speakers' Corner
White Papers
Jobs & Careers
Gallery
News & Updates
Events Listings
Newsletter Archive
Newsletter Sign-Up
Advertise
About Our Services
Client Area


RSS What is RSS
For everyone in building design and construction