Starwood Hotels & Resorts Worldwide plans to further expand its presence in Sharjah with the opening of the 220-room Four Points by Sheraton Sharjah hotel in 2013. The mixed-use property will be owned by Hassan Ahmad Ibrahim Al Marzouqi and will include office, residential and retai
Paradisus Resorts, operated by Spanish hotel and resort company Sol Meliá, has announced that it will develop a new property in Papagayo Bay, Costa Rica, by July 2013. The 381-room resort has been located on a 21-hectare site and features five restaurants and five bars, a spa and health
LaSalle Investment Management has purchased the Novotel Melbourne for A$204m ($221m) from Thakral Holdings Group. The contract includes a 380-room Novotel Melbourne on Collins Hotel and the adjoining 7,797m² Australia on Collins shopping centre, according to The Asset. Th
Jumeirah Group, the Dubai-based luxury hospitality company and a member of Dubai Holding, is planning to increase its hotel portfolio from 42 to 60 hotels by the end of 2012, according to Gulf News. Jumeirah is planning to open nine hotels this year and increase its number of rooms by 2
France-based hotel group Accor is considering selling catering company Lenôtre to focus on its core hospitality business. Lenôtre operates 64 outlets in 13 countries. Its estimated value is between $74m and $89m. Accor, which owns the Novotel and Motel 6 brands, agreed to se
The Ritz-Carlton Hotel Company has opened its first hotel in the Saudi Arabian capital of Riyadh. The 493-room Ritz-Carlton, Riyadh is situated on a 213,500m² site with a 1km driveway. The hotel offers 49 two-bedroom Royal Suites each measuring 430m², 50 two-bedroom
Hyatt Hotels has formed a joint venture with White Lodging Services to construct and own a Hyatt Place hotel in Austin, Texas, US. A Hyatt affiliate and a White Lodging affiliate will each own a 50% stake in the joint venture and White Lodging will operate the property under a franchise

Previously known as Sacramento Entertainment and Sports Center (ESC), Golden 1 Center is a 750,000m² indoor multi-purpose arena located at Downtown Plaza, Sacramento, California, US. As owners of the ESC, the City of Sacramento has leased the facility to the Sacramento Kings basketball team, which built and uses it as its home venue.

The construction of the new sports and entertainment arena required the demolition of a portion of the Downtown Plaza between 7th Street and east of 5th Street. Demolition started in August 2014. The official ground-breaking of the new arena was made in October 2014. The sports centre was officially opened to the public in September 2016.

The facility was designed by AECOM.

Structure and design of Golden 1 Center

The most distinctive design element of the Sacramento ESC is a grand entryway measuring 50ft x 150ft, located below a terrace offering outside views of the public plaza and the Sacramento River, as well as an inside view of the indoor activities. Five bi-fold transparent doors between the ‘Riverview Terrace’ and the grand entrance fold upwards to open up the arena towards the city during good weather. The centre has a seating capacity of 17,500.

The 10ft-high vertical base of the arena is designed to reflect the greenery of the horizon, which consist of forests and parks. The façade of the introverted building structure features vertical and wavy panels made of perforated silver aluminium and glass, giving the building a white and silver look, while the reflected sunlight creates a light and shadow effect on the exterior.

The perforated panels made of glass and metal elements also feature trees and leaf patterns, which symbolise Sacramento’s green mission of planting ‘one million trees’.

An open space or plaza was developed around the arena to provide entertainment, relaxation and social spaces. The landscape of the plaza comprises local plants.

Facilities at the Golden 1 Center

The ESC has the facilities for sports and concerts and is also able to host trade shows, indoor rodeo, ice shows, and other indoor programmes.

The new arena is larger than the current 440,000m² Sleep Train Arena with more available seating and 34 modern suites that are double the size of the suites in the current arena. The suite guests have access to three exclusive clubs and two Skyboxes offering inside and outside views.

The arena is well-connected with the city’s light rail network and features 13,500 parking spaces. The plaza around the arena houses a dining court, retail outlets, an event plaza, and a mixed-use terrace.

Materials used and sustainability features

Sustainable and recyclable materials collected from local sources were used to build the sports centre. The building materials include precast concrete with sand from San Benito, rocks of Sierra grey limestone, aluminium panels with ceramic frit and US Forest Stewardship Council (FSC)-certified wood.

Other sustainable features of the project include electric vehicle charging stations, hydroponic gardens that grow food for onsite consumption, minimum solar gain glass design, efficient temperature control and energy-saving lighting systems.

The sports and entertainment complex is claimed to be carbon and grid neutral. The developers achieved Leadership in Energy and Environmental Design (LEED) Platinum certification for the project, which made it the first sports arena in California to achieve such certification.

Financing for the Golden 1 Center

The project was jointly financed by the Sacramento Kings and the City of Sacramento. The Sacramento Kings provided $254m for the ESC construction while the city-funded the remaining $223m.

Contractors involved

Turner Construction is the construction contractor for the project. After conducting a feasibility study for the project, ICON has been appointed as the project manager by the City of Sacramento.

Lerch Bates was selected for designing the centre’s facade access system in October 2014.