Toledo Museum of Art Glass Pavilion

Order Year

2001

Construction Started

2004

Completion Date

August 2006

Estimated Investment

$30m

Site Size

218,700ft²

Building Size

76,000ft²

Design Architect

SANAA

Executive Architect

Kendall Heaton Associates

Construction Management

Rudolph / Libbe

Financing

Toledo Museum of Art

Project Manager

Paratus Group

Design Structural Engineer

SAPS / Sasaki and Partners

Structural Engineer of Record

Guy Nordenson & Associates

MEP (Mechanical / Electrical / Plumbing) Engineer

Cosentini Associates

CFD Thermal Analysis

Transsolar

Lighting Consultant

Arup Lighting and Kilt Planning Group

Curtain Wall Consultant

FRONT Inc.

Acoustic / AV Consultant

Harvey Marshall Berling Assoc.

Graphics Design / Signage

2×4

Concrete Consultant

Azzerone

Civil Engineer

The Mannik & Smith Group Inc

Geotechnical Engineer

Bowser Morner

Security Consultant

CH Guernsey / Layne Consultants

Elevator Consultant

Persohn / Hahn Assoc. Inc.

Landscape Consultant

Neville Tree & Landscape

Glassmaking Facility Consultant

Spiral Arts Inc.

Lampworking Consultant

Glasscraft Inc.

Casework Designer

Imrey Culbert

Cost Estimator

Stuart-Lynn Co. Inc.

Curtain Consultant

Inside Outside

Curtain Fabricator

Specialty Drapery

Glass

UAD Group (NYC) and Toledo Mirror & Glass

Doors and Hardware

General Building Products

Millwork

Walbridge Woodworks, Inc.

Interior Finishes

Lakeside Interior Contracting

Painter

OCP Contractors

Sheetmetal / Metalworking

VM Systems

Mechanical

Dunbar

Electrical

Romanoff

Sprinkler System

Automatic Fire Protection

Steel Erection

Henry Gurtzweiler Inc.

Rebar Installer

DeWitt Rebar

Roofing

Nordmann Roofing

Waterproofing

DC Byers

Temperature Controls

Campbell Inc. (Toledo, Ohio)