UK-based provider hospitality software Agilysys (Europe) has secured a contract to provide technology to The Landmark London Hotel in London, UK. The hotel will install InfoGenesis POS by Agilysys, a touchscreen point-of-sale solution for restaurants and bars, as well as the ResPAK dini
CDL Hotels Holdings Japan, a subsidiary of Millennium & Copthorne Hotels, is to invest £113m in expanding its hotel portfolio with the opening of a new property in the Tokyo district of Ginza, Japan. The investment includes the acquisition and development of a property from Cosmos
Marriott International has signed agreements with Empire Iraq to manage a 200-room upscale Marriott Hotels & Resorts-branded hotel and a 75-unit deluxe Marriott Executive Apartments property in Erbil, Iraq. The Erbil Marriott and the Marriott Executive Apartments Erbil, Marriott In
The Grand Hyatt San Francisco hotel, which is located on San Francisco's Union Square, is to undergo a $70m multiphase renovation. The project, which is expected to be completed by 2012, will reappoint and add new technologies to the hotel's 659 guestrooms and suites, redesign the Gran
Hilton Worldwide has signed a franchise agreement with Cairn Hotel Group to open a DoubleTree hotel at Newcastle International Airport, UK. DoubleTree by Hilton Newcastle International Airport, which will open this year, will offer 179 guestrooms, 11 conference rooms, a business centre

The Leadenhall Building is an 802ft (224.5m)-high office tower designed by architecture firm Rogers Stirk Harbour + Partners.

The office tower, located opposite Lloyd’s in the City of London, is the tallest office space in the immediate area. The iconic 50-storey building was jointly developed by two real estate companies, British Land and Oxford Properties.

Construction of the Leadenhall Building started in 2011 and was completed in August 2014.

Site of the Leadenhall Building

Leadenhall Building has been erected in the heart of the City of London over an area of 3,500m². The site is surrounded by other tall buildings in the city.

The construction site had a 12-storey office building built in the 1960s, which was demolished to build the new tower.

The site offers good transport connectivity. It provides easy access to underground stations at Bank, Liverpool Street, Aldgate and Moorgate.

It is located in close proximity to major commuter hubs, including Liverpool Street, Fenchurch Street, Cannon Street and London Bridge. The site also provides quick connections to all London airports including Heathrow Airport.

The Leadenhall Building’s design and structure

The Leadenhall Building design features a tapering shape in order to protect the sight of the nearby St Paul’s Cathedral dome. The building structure, when viewed from the west, appears to be inclined away from the Cathedral.

The rectangular floor plates of the building shrink in size as the building height increases. The floor plate size ranges from 16,000ft² on the lower floors to 6,000ft² on the top floor.

The high-rise office tower has an external braced tube structure rendering lateral stability rather than the traditional central concrete core. The building is designed to have a transparent envelope with its structural steelwork visible from the outside.

The building features a seven-storey landscaped open Galleria space of approximately half an acre at its base, providing lawns, seating, trees, retail units and exhibition spaces for the public. The main reception of the building is accessed by escalators from the Galleria space.

The circulation and servicing core of the office building housing passenger and goods lifts are located in a separate north-facing tower at the rear of the building.

Leadenhall Building facilities

The building provides 610,000ft² of office space over 47 floors. As of April 2015, 72% of the office space in the building is let.

International insurance company Aon shifted its global headquarters from Chicago to the Leadenhall Building. It occupies an area of 191,000ft² from level four to 13 of the building. Another insurance company, Amlin, occupies 111,000ft² of space on levels 18-24 as well as level 45.

Construction and sustainability of London’s Leadenhall Building

The construction of the building involved 18,000t of steel and 70,000m² of cladding.

Most of the structural and architectural components, including solid concrete floors, were manufactured off-site and then delivered and assembled on-site, which accounts for around 85% of the total construction cost.

The columns and beams of the perimeter tube frame are connected together by nodes and all the joints of the external frame are connected with the use of pre-stressed bolts made of steel rods with up to 76mm diameter. The construction of the building was 50% complete in November 2012. The topping out of the building occurred in June 2013.

The building features a sustainable design with office areas protected from solar radiation with the use of solar responsive Venetian blinds fitted in the cavity of the double-layer glass facade on the east, south and west sides of the building.

Water consumption is minimised through low-flow water fixtures and fittings. The building also uses an energy and water metering system for efficient management of water and energy consumption.

The building construction produced almost zero waste since most of the components were designed and manufactured offsite.

Contractors involved with the Leadenhall Building project

Laing O’Rourke was the project’s main contractor. Arup provided structural and service engineering services. Project management services were provided by M3 Consulting. DP9 was involved as the planning consultant. Davis Langdon worked as the quantity surveyor.

Lift engineering services were provided by Kone. Warrington Fire Research was engaged as the fire consultant. Edco Design London was responsible for the landscape architecture of the building.